Custom Homes, Additions & Outdoor Living — Durham & the Triangle
MMabrey ConstructionCustom Homes · Durham NC
A luxury custom home in the North Carolina Triangle at golden hour
Veteran-OwnedLicensed NC GCFixed-Scope Contracts15+ Years

Close-in Triangle lots are the ones people fight over — but the 1960s ranch sitting on one may not be worth saving. Mabrey Construction evaluates the lot, the structure, and the numbers honestly, and when rebuilding wins, we run demolition through new construction as one accountable design-build project on a fixed-scope contract.

Veteran-owned, Durham NCOne accountable team, start to finish
Step 1 of 3

Get Your Free Consultation in 60 Seconds.

Typical projects $25k–$250k+Construction financing guidance included

Typical ranges, not a quote or an offer to lend. Your number comes from a site visit.

The Straight Answer

A knockdown-rebuild replaces an aging house on a lot you already love with a new custom home — and in Durham and the Triangle's close-in neighborhoods, the lot is often worth more than the house standing on it. Mabrey Construction handles the whole sequence under one contract: feasibility and lot evaluation, demolition permits, and a ground-up design-build.

Read more

Rebuild projects are scope-driven custom builds, typically starting around $500,000, and most run ten to sixteen months from design to keys. When the location is right and the house is wrong, rebuilding beats renovating a structure that will fight you at every wall.

Renovate or Rebuild, Honestly
2numbers, side by side

We walk the structure and the lot, then put the comparison in writing. Sometimes the renovation wins — you will hear that from us too.

Demolition, Handled
0of your weekends spent

Permits, disconnects, abatement checks, and clearing — the messy chapter runs on our schedule, not your weekends.

A Custom Home on Your Lot
10-16months to keys

From foundation to final walkthrough, the rebuild runs as a documented design-build project with one team accountable for all of it.

Included as Standard

The Complete Rebuild Sequencecore inclusionsstandard, never upsold
  • An honest renovate-versus-rebuild evaluation before any design money is spent
  • Lot and zoning feasibility: setbacks, trees, utilities, and what the parcel allows
  • Demolition permits, utility disconnects, and site clearing managed for you
  • A ground-up custom design built around the lot you already own
  • Durham, Wake & Orange county permitting handled start to finish
  • Fixed-scope contract pricing with allowances itemized in writing
  • One accountable team from the last day of the old house to the keys of the new one
  • The documented 7-step framework, so you always know what happens next
Veteran-OwnedWritten Workmanship WarrantyLicensed & Insured NC GC
Do You Need This?

Rebuild or Renovate? Signals the Teardown Wins.

If any of these sound familiar, book a free evaluation. We walk the structure and the lot, then put the renovate-versus-rebuild comparison in writing — and if the renovation wins, you will hear that from us too.

The lot and the neighborhood are exactly right — the house is notThe lot and the street are the parts money cannot re-buy — the house is the replaceable part.
A renovation estimate keeps growing every time someone opens a wallA renovation number that grows at every opened wall is the structure telling you what it really needs.
The foundation, framing, or systems make remodeling a losing fightWhen foundation, framing, and systems all need work at once, patching becomes the expensive path.
Nearby teardowns are becoming the street's best housesTeardowns becoming the best houses nearby is the market pricing your lot above your house.
You want a new home without leaving the schools and streets you choseKeeping the schools, neighbors, and streets you chose — with a new home on them — is the whole point.
Two or more signals showing? Get both numbers in writing before you spend design money on either path.
Before You Decide

The Renovate-vs-Rebuild Math, Done Honestly

  • Both paths priced in writing, side by side
  • Structure walked before any design money
  • The renovation wins sometimes — we say so
2numbers, in writingThe Math

Reading the Lot Underneath the House

  • Setbacks re-checked — old footprints can be grandfathered
  • Tree and neighborhood rules read early
  • Utility age and capacity priced into the plan
Re-readsetbacks + trees firstThe Lot

Demolition: The Messy Chapter, Managed

  • Demo permits and disconnects handled for you
  • Abatement checks before machines arrive
  • The site handed to the build crew clean
Managedpermits + disconnectsDemolition

The Ground-Up Build on a Lived-In Street

  • The same documented 7-step framework
  • Staging planned for an established street
  • Bi-weekly updates from demo to keys
7-stepsame documented buildThe Build

The Timeline, Honestly: Ten to Sixteen Months

  • Design and permits before demolition starts
  • Living arrangements planned into the sequence
  • The full timeline in writing at contract
10-16months, design to keysTimeline

Why the Whole Sequence Wants One Contract

  • One accountable name, last day to first key
  • No demo-to-builder gap to referee
  • Surprises owned, priced, and put in writing
1contract, demo to keysOne Team
FAQ

Cannot find your answer? A real person is one call away, no pressure.

  • A real person answers. No phone tree, no pressure to commit.
  • Free consultation: scope, budget, and next steps in writing — before any contract.
  • Straight answers on cost, permits, and financing, even when the answer is that the smaller project wins.
answersthe questions we actually get

It depends on the structure. When a house needs foundation, framing, systems, and envelope work all at once, a rebuild often delivers a better home for comparable money — new everything instead of patched everything. We put both numbers in front of you before you commit to either.

Rebuilds are scope-driven custom builds, typically starting around $500,000 for the new construction, plus demolition and site work that depend on the existing structure and lot. The feasibility visit turns that into a real number in writing.

Most rebuilds run ten to sixteen months from first design meeting to keys, including demolition and county permitting. We give you the timeline in writing and keep you updated as milestones land.

Usually no — the site becomes an active construction zone once demolition starts. Most families rent nearby or time the build around a move. We help you plan the sequence so the gap is as short as possible.

Answered by the Crew That Does the WorkMeet the builder

Start with a free consultation. A real builder calls you back, no pressure, ever.

Call NowFree Estimate